renovation

The Design Development Phase

Ya’ll. October was crazy. How in the heck do other people keep up with blogging every week. Nay, a few times a week?! My apologies. I hope to do better from now through the end of the year. Here’s my next story based on the design process at Midnight Midcentury.

Photo by Courtney Paige Ray

Photo by Courtney Paige Ray

Design Development is the next phase in the process of working with a Design Professional. In case you missed the first steps, you can read it here before you read this story.

So now you’ve settled on a design concept and floor plan. Great! Time to sign off on Phase 1 and move into Phase 2. You Design Professional will have you officially approve of your selected concept and floor plan, then bill you for the end of Phase 1, per your signed agreement.

The Design Development Phase is when your project begins to come to life. Your Design Professional will begin sourcing furniture and finishes as well as designing and drawing cabinetry or any other custom built items. If you are knocking down any walls or moving things around (like kitchens and bathrooms) those drawings will be made as well.

I like to provide little mock ups for my clients so they can visualize various options as they come together. Here are three different mock-ups I put together for Midnight Midcentury

Opt2_2.jpg
Opt3_2.jpg

These provided a lot of great feedback from the client in that they told me the things that they definitely wanted and other things that they would like to see more options for. Having a variety allows the client to more specifically describe what they do and don’t like about certain things. In this case, it was that they wanted fully upholstered lounge chairs and the dark blue wall with grey sofa. This client was also pretty certain about rug, chandelier, and table dining table options, so that set up on the path to be able to view these items in person prior to purchasing. The overall concept is there, and now it comes down to keying in on the specific pieces that are desired.

When I’m working on remodel and cabinetry work (which, being an architect and interior designer, is pretty much a given) I work through drawings which are super important. Once fully developed, the drawings become what is given to the contractor or millworker as the design to build from. I also use them as a way to show little vignettes to my clients to help them better visualize what their cabinet, fireplace, etc could look like.

drybar_opt3.jpg
powder room_opt1-3-1.jpg

This phase doesn’t have just one meeting, it’s a lot of back and forth and parting of the different design elements until the client is happy with each individual item. This phase generally takes the longest of any design phase.

#Wednesday Round-Up Guest Post: Bedside Sconces

Today Jessica Davis, founder and creative director of Nest Studio, is bringing you a thorough round-up of gorgeous and affordable bedside sconces.


from Griege Design

from Griege Design

Recently I've spent a lot of time looking at bedside sconces for our master bedroom and also for the kids' rooms. I really love a sconce at the bed. It offers directional lighting so one person can sleep while the other reads and it keeps our nightstand surface uncluttered which is key if you have a small nightstand.  Here are a few of my favorite bedside sconces right now (so many great affordable options).

Sconces-2.jpg

Brentwood Remodel Progress

 
How many people does it take to get a 500 lb tub from the garage up to a second floor apartment? 8. It takes 8.

How many people does it take to get a 500 lb tub from the garage up to a second floor apartment? 8. It takes 8.

This week, the finish work begins in our Master Bathroom renovation project.  Finish work - which is the work you see when you look at a final project - always moves so quickly compared to all the prep work. But the prep work is very important, of course, as it's the backbone that holds the project together. You just never notice it - at least in a well done project. In the case of our Master Bathroom renovation project in Brentwood, Los Angeles, the plumbing, electrical, and walls were important things that needed to be well prepped before tiling could begin. Now the plumbing has been located in the proper places for two sinks at the vanity, a new shower in the niche, and a new freestanding tub. Electrical was also moved to make more logical placement of the switches instead of the old locations which had four different switches all throughout the bathroom (completely ridiculous and highly inefficient!) We also simplified the lighting by adding recessed fixtures in the middle "aisle" of the bathroom as well as one fixture in the shower niche.  After these two major items were completed, the cement/mortar bed was done everywhere where tile will be located. Now it's ready for the tiling! Flooring is the first step, which is about half way done as of last night.  Stay tuned for more pictures as this project will quickly come to completion!

 

Demo complete down to the studs

Demo complete down to the studs

Mortar and cement bed almost ready to receive tile

Mortar and cement bed almost ready to receive tile

Last minute on site tile decisions being made

Last minute on site tile decisions being made

Floor tiles are halfway complete! Nice flush transition to the wood flooring at the Master Bedroom.

Floor tiles are halfway complete! Nice flush transition to the wood flooring at the Master Bedroom.

 

Let the Demolition Begin!

 
Partial demo....or Contemporary Art Exhibition?  You decide.

Partial demo....or Contemporary Art Exhibition?  You decide.

The Master Bathroom renovation project which we refer to as "Blatau Residence" is officially under construction as demolition began last week!  Since this is a condo project and the previous work that had been completed was done quite poorly, the homeowner wanted to first do total demolition before ordering all the materials and fixtures, so it will be a week or so before the new construction begins.  But the good news is the existing conditions are all good and ready for our design to be implemented!

It's always so interesting discovering what is in your floors and walls.  It can really unearth how lucky you really are, as was the case in this project where there was no waterproofing membrane at the shower. Just concrete on top of the plywood.  Our contractor asked the client if the downstairs neighbor ever complained about leaks, they didn't. The plywood sub-floor also doesn't have signs of dry rot.  So lucky.

Hire a good contractor!  Don't do work yourself if you don't know what you are doing!!  You can have major problems down the road that you could be held responsible for!!!

Take a good long look at these "Before" photos, because before too long, you won't be able to recognize what we've done to the space.

Before

Before

Before

Before

Complete Demolition

Complete Demolition