Brentwood Remodel Progress

 
How many people does it take to get a 500 lb tub from the garage up to a second floor apartment? 8. It takes 8.

How many people does it take to get a 500 lb tub from the garage up to a second floor apartment? 8. It takes 8.

This week, the finish work begins in our Master Bathroom renovation project.  Finish work - which is the work you see when you look at a final project - always moves so quickly compared to all the prep work. But the prep work is very important, of course, as it's the backbone that holds the project together. You just never notice it - at least in a well done project. In the case of our Master Bathroom renovation project in Brentwood, Los Angeles, the plumbing, electrical, and walls were important things that needed to be well prepped before tiling could begin. Now the plumbing has been located in the proper places for two sinks at the vanity, a new shower in the niche, and a new freestanding tub. Electrical was also moved to make more logical placement of the switches instead of the old locations which had four different switches all throughout the bathroom (completely ridiculous and highly inefficient!) We also simplified the lighting by adding recessed fixtures in the middle "aisle" of the bathroom as well as one fixture in the shower niche.  After these two major items were completed, the cement/mortar bed was done everywhere where tile will be located. Now it's ready for the tiling! Flooring is the first step, which is about half way done as of last night.  Stay tuned for more pictures as this project will quickly come to completion!

 

Demo complete down to the studs

Demo complete down to the studs

Mortar and cement bed almost ready to receive tile

Mortar and cement bed almost ready to receive tile

Last minute on site tile decisions being made

Last minute on site tile decisions being made

Floor tiles are halfway complete! Nice flush transition to the wood flooring at the Master Bedroom.

Floor tiles are halfway complete! Nice flush transition to the wood flooring at the Master Bedroom.

 

Let the Demolition Begin!

 
Partial demo....or Contemporary Art Exhibition?  You decide.

Partial demo....or Contemporary Art Exhibition?  You decide.

The Master Bathroom renovation project which we refer to as "Blatau Residence" is officially under construction as demolition began last week!  Since this is a condo project and the previous work that had been completed was done quite poorly, the homeowner wanted to first do total demolition before ordering all the materials and fixtures, so it will be a week or so before the new construction begins.  But the good news is the existing conditions are all good and ready for our design to be implemented!

It's always so interesting discovering what is in your floors and walls.  It can really unearth how lucky you really are, as was the case in this project where there was no waterproofing membrane at the shower. Just concrete on top of the plywood.  Our contractor asked the client if the downstairs neighbor ever complained about leaks, they didn't. The plywood sub-floor also doesn't have signs of dry rot.  So lucky.

Hire a good contractor!  Don't do work yourself if you don't know what you are doing!!  You can have major problems down the road that you could be held responsible for!!!

Take a good long look at these "Before" photos, because before too long, you won't be able to recognize what we've done to the space.

Before

Before

Before

Before

Complete Demolition

Complete Demolition